Support
Plan equal-width balusters on a level rail or stair rake.
Getting started
Choose one of five presets or enter the horizontal clear span between the inside faces of the end posts, the baluster's actual width, and the maximum clear opening. Choose equal gaps, fixed on-center spacing with centered ends, or a fixed pitch from the left post.
How do stair marks work?
Enter one step's rise and tread run. The app shows the rake angle and converts each horizontal leading-edge, center, and trailing-edge coordinate into a sloped tape mark measured from the inside of the left post. The 4-inch opening check uses horizontal openings.
What do the reference checks mean?
The optional 4-inch sphere and stair 6-inch triangle checks mirror references shown by the source calculator. They do not determine local code compliance, structural adequacy, or construction tolerances. Local rules, amendments, project type, and exceptions vary; confirm requirements for your project.
How do I save or share a layout?
Save a named plan to keep its inputs and marking progress. Copy the tape list, share an SVG blueprint, or print the PDF cut sheet. Calculations and plans work offline; a copy leaves the app only when you choose a sharing destination.
How do I delete my data?
In Help, choose Delete all local data. This removes saved plans and marking progress stored by the app on this device.
Contact
For help or feedback, email [email protected].